Background Image
Previous Page  31 / 48 Next Page
Information
Show Menu
Previous Page 31 / 48 Next Page
Page Background

Performance indicators

Employee well-being

Rate of short-term

absenteeism

Rate of long-term absenteeism

(surgery, prenatal, etc.)

Number of workplace accidents

in 2014

1.6%

2%

0

As part of calls for tenders, it sets out everyone’s

responsibilities clearly and unequivocally in its specifications

documents.

In the context of buildings maintenance, Cofinimmo fits its

buildings with safety systems in order to guarantee suppliers

physical safety (e.g. aerial lifts and anchoring points for

window-cleaning teams). Subcontractors’ services are subject

to framework contracts allowing partnerships to be developed

with Cofinimmo.

In 2015, Cofinimmo plans to improve its control of real estate legis-

lation in countries other than Belgium, where it owns buildings.

Asbestos control in leased buildings

The asbestos present in buildings is encased in materials. In the

event of deterioration, this material is removed in accordance with

legislation to ensure user safety.

Periodic asbestos inspections are conducted either by occupants

or by Cofinimmo or its subsidiaries, depending on applicable

regulations.

0%

25%

50%

75%

100%

PPP: 6 buildings

MAAF distribution network: 284 buildings

Pubstone distribution network: 1,075 buildings

Healthcare real estate: 158 buildings

Offices: 113 buildings

Traces of asbestos

No traces of asbestos

Study in progress

29