Obtaining optimum residual value for a nursing
home after 27 years of occupation, by responding
to buildings’ renovation or reconversion needs –
that is one of the issues overcome by a carefully
planned sustainable development policy.
Bart Bots, Senior Living Group*, CEO
Property of distribution
networks
Public-Private
Partnership
Major external renovation of
the Martelaarplein 6-7 building
in Louvain (café/restaurant)
Construction of a prison
in Leuze-en-Hainaut
Despite constraints linked to the renovation of an historic building,
the renovation of the façades and roofs made it possible to improve
the building’s insulation.
This “model” prison exceeds compulsory energy specifications.
The insulation level is K30, while total energy consumption stands
at E60.
The establishment is aiming for energy neutrality while guarantee-
ing occupants’ comfort.
Financing
•••
Design
•
Construction
•
Marketing
•
Property Management
•
Demolition/ Renovation or reconstruction
••
Financing
••
Design
•
Construction
••
Marketing
•
Property Management
••
Demolition/ Renovation or reconstruction
•
Sustainability measures:
•
New double-glazed windows
•
Cleaning of the façades, replacing the joints and French stone
•
Replacement of roof slates
Sustainability measures:
•
Use of sustainable insulation material
•
Waste management plan on the site
•
Establishment of a sustainable energy management plan
•
Limited daily time for hot water showers
•
Use of rain water
•
Installation of hundreds of solar panels on the roof
(343 MWh net production)
•
Creation of planted courtyards for inmates
* Healthcare operator in Belgium
13